Factory and quality
What is checked, what is crated, what we will not print a badge for.
LaserCompact configures air-cooled handheld welders for export. The quote names the configuration. A logo on a website is not a certificate, and this page does not invent one.
- 1
Match the order
Class, source, gun, fiber length, feeder, and language of the controller are checked against the proforma before a burn-in.
- 2
Run it
The source is run under load. Duration and power are written on the QC sheet that ships with that serial, not as a slogan on this page.
- 3
Safety devices
Emergency stop, ground path, and the gun interlock are exercised. A machine that only welds with a switch held shut with tape does not ship.
- 4
Optics
Protective windows, nozzle, and a trial bead on the coupon named for the order. You can ask for that coupon to be your alloy.
- 5
Crate
Spare kit listed on the packing list, English quick-start, parameter sheet, and the commercial documents for the incoterm.
Documents a quote can carry
- Proforma or commercial invoice, packing list, and serial
- Parameter sheet and QC sheet for that machine
- Spare-parts list
- The destination file your importer named — for example a CE documentation set — only when the quote says that file is included for that configuration
Delivery
Ex Works, FOB, and CIF or CIP are the usual choices. Sea freight is the default when the date allows. Air is quoted when it does not. Transit days are given with the lane, because a sentence that promises “seven days worldwide” is not a plan.
Payment terms sit on the invoice: typically a deposit and the balance before the crane. The method is confirmed there.